Thursday 1 May 2008

Train routs to Bangkok airport is scheduled to launch in December


New dates opening movement of high-speed train from Bangkok Suvarnabhumi Airport to the city appointed December. Previously, it was assumed that this will happen in autumn. On Line trains will operate nine German group Siemens, which already pass the test.

Aboveground line length of 28.6 kilometers will be served through two routes. Airport Express trains will have to go without stopping at a speed of 160 km / h to urban aviaterminala Makkasan, which is located near the metro station Phetchaburi. On this trip will require 15 minutes. Trains Airport City Line overcome the same distance with four stops (Lad Krabang, Thub Chang, Hua Mark, Ramkhamhaeng) for 27 minutes and then continue the path of One Stop (Ratchaprarop) located closer to the city centre station Phaya Thailand property, together with the same aboveground subway station Skytrain. Each train will have three passenger cars, but will also Airport Express vans. City aviaterminal Makassan at 270 meters in length will have three floors.

At the first parking for 200 cars, the second will be given to passengers arriving in Bangkok property, third - departing. There, they will be able to register for the flight, as well as deliver the luggage.

No comments: